煤炭工程 ›› 2021, Vol. 53 ›› Issue (2): 85-89.doi: 10.11799/ce202102017

• 生产技术 • 上一篇    下一篇

水力化增透技术在碎软煤层瓦斯抽采中的应用研究#br#
#br#

王正帅   

  1. 中煤科工集团重庆研究院有限公司
  • 收稿日期:2020-03-11 修回日期:2020-05-21 出版日期:2021-02-20 发布日期:2021-05-10
  • 通讯作者: 王正帅 E-mail:573804192@qq.com

Study on the application of hydraulic anti-reflection measures in gas extraction of broken soft coal seam in Xinjiang

  • Received:2020-03-11 Revised:2020-05-21 Online:2021-02-20 Published:2021-05-10

摘要: 为了解决新疆地区碎软突出煤层透气性差、瓦斯抽采难度大的问题,将多种水力化增透措施应用于碎软突出煤层瓦斯抽采中。通过在新疆艾维尔沟矿区4号煤层开展了高压水力割缝和水力压裂试验,并从抽采浓度、纯流量、衰减及工期等方面做了比较分析。研究表明:水力割缝和水力压裂后抽采浓度和抽采纯流量均呈现出先升高、后衰减、最后平稳的形态|单孔平均浓度与普通密集抽采孔相比分别提高了7.7和5.7倍,单孔平均纯流量分别提高了3.4和2.1倍|返排期后,抽采纯流量呈指数函数规律快速衰减,且前者明显比后者衰减快。采取水力化增透措施后,钻孔工程量大幅减少、总工期大幅缩短。

关键词: 水力化增透, 碎软煤层, 瓦斯抽采, 高压水力割缝, 水力压裂

Abstract: In order to solve the problems of poor gas permeability and difficult gas drainage in broken and outburst coal seams in Xinjiang, a variety of hydraulic measures to increase permeability are applied to the gas extraction of broken soft outburst coal seam. High pressure hydraulic cutting and hydraulic fracturing tests were carried out in No. 4 coal seam of Aiweiergou mining area in Xinjiang, and comparative analysis was made from the aspects of extraction concentration, pure flow, attenuation, construction period and construction process. The research shows that the extraction concentration and the pure flow rate after hydraulic cutting and hydraulic fracturing show a pattern of increasing first, then attenuating, and finally stable. The average single hole concentration of the hydraulic cutting extraction hole and the hydraulic fracturing extraction hole was increased by 7.7 and 5.7 times compared with the ordinary dense extraction hole, respectively, and the average pure flow rate of the single hole was increased by 3.4 and 2.1 times, respectively. After the return period, the drainage pure flow rate decayed exponentially, and the former decayed significantly faster than the latter. After the adoption of hydraulic measures, the amount of drilling work has been greatly reduced, and the total construction period has been significantly reduced.