西卓煤矿恢复建设工程优化设计对策

杨彦宏   

  1. 中煤科工集团北京华宇工程有限公司
  • 收稿日期:2021-07-07 修回日期:2021-08-29 出版日期:2022-01-14 发布日期:2022-07-07
  • 通讯作者: 杨彦宏 E-mail:as_4598@163.com

Optimization design countermeasures of Xizhuo coal mine resume construction project

  • Received:2021-07-07 Revised:2021-08-29 Online:2022-01-14 Published:2022-07-07

摘要: 以西卓煤矿恢复建设为工程背景,结合矿井建设现状,根据停缓建期间设计基础条件变化情况,按照现行政策规定,对照标准规范更新情况,结合新技术发展水平,对矿井投产盘区布置、建构筑物改造及修复、采掘运输系统、井下矸石分选及充填、采暖降温、水处理及外排、水害防治等工程进行优化设计,可作为类似矿井恢复建设工程的设计参考。

关键词: 恢复建设矿井, 标准规范更新, 安全环保工程

Abstract: Based on the engineering background of Xizhuo coal mine resume construction, combined with the current situation of mine construction, according to the changes of design basic conditions during the period of suspension and construction, according to the current policies and regulations, compared with the update of standards and specifications, and combined with the development level of new technology,the project design scheme was optimized, including the layout of the mine production panel, the reconstruction and repair of buildings and structures, the mining and transportation system, separation and filling of underground gangue, heating and cooling, water treatment and drainage, water disaster prevention and control, etc. It can be used as a reference for the design of similar mine restoration projects.