煤炭工程 ›› 2022, Vol. 54 ›› Issue (3): 50-55.doi: 10.11799/ce202203010

• 施工技术 • 上一篇    下一篇

大采高厚坚硬顶板巷道定向爆破切顶卸压技术研究

刘乙霖1,马嘉伟2   

  1. 1. 晋能控股山西科技术研究院有限公司同大科技研究院矿山机电研究所
    2. 中国矿业大学
  • 收稿日期:2021-09-13 修回日期:2021-11-12 出版日期:2022-03-15 发布日期:2022-05-13
  • 通讯作者: 马嘉伟 E-mail:cumtmjw@cumt.edu.cn

Research on the Technology of Cutting and Relieving Pressure by Directional Blasting in a Roadway with Large Mining Height, Thick and Hard Roof

  • Received:2021-09-13 Revised:2021-11-12 Online:2022-03-15 Published:2022-05-13

摘要: 针对马道头煤矿5209工作面回风巷在高强支护情况下,伴随着上临5210工作面回采产生的巷道大变形问题,采用理论分析、数值模拟、现场试验等方法,对大采高厚坚硬顶板巷道定向爆破切顶卸压技术进行了研究。研究结果显示:巷道爆破切顶卸压的工作机理是通过对煤柱侧未垮落基本顶岩层进行爆破切顶,使其及时垮落,进而减小煤柱载荷和基本顶岩层因为旋转下沉而对煤柱造成的挤压变形|基本顶岩层在爆破切顶卸压后初次垮落步距与周期垮落步距均减小,进而减轻了矿压显现程度|爆破切顶卸压的最佳切顶角度为60°,在爆破切顶卸压后,煤层垂直应力峰值由21.1MPa降低至16.3MPa|爆破后钻孔窥视结果显示,爆破孔与导向孔均沿着孔内聚能管聚能槽方向产生了与走向切缝方向一致裂纹|在5209回风巷进行了巷道表面位移观测发现总体变形量较小,巷道完整性较好,定向爆破切顶卸压效果显著。

关键词: 大采高工作面, 特厚煤层, 爆破切顶卸压, 数值模拟, 现场试验

Abstract: Aiming at the large deformation of the roadway that still occurs with the 5210 working face under the condition of high-strength support in the 5209 return airway of Madaotou Coal Mine, theoretical analysis, numerical simulation, field experiments and other methods are used to conduct underground directional blasting for large mining heights and thicknesses. The technology of roof cut and pressure relief by directional blasting in roof roadway has been studied. The research results show that the working principle of roadway blasting and top-cutting pressure relief is to blast and top-cut the basic top rock layer on the side of the coal pillar to make it collapse in time, reduce the load of the coal pillar and the basic top rock layer due to the rotation and sinking. The load on the coal pillar; the basic top rock strata is reduced in both the initial collapse step and the periodic collapse step after the roof is cut and relieved, thereby reducing the appearance of the rock pressure; the best cutting angle for the blasting and pressure relief is at 60°, after blasting and cutting the top and releasing the pressure, the peak stress decreased from 21.1 MPa to 16.3 MPa; after the blasting, the drilling and peeping results showed that the blasting hole and the pilot hole produced a gap with the direction along the direction of the energy-concentrating tube in the hole Cracks in the same direction; observation of the surface displacement of the roadway in the 5209 return airway revealed that the overall deformation is small and the roadway integrity is good, indicating that the directional blasting has a significant effect of top-cutting and decompression.

中图分类号: