煤炭工程 ›› 2022, Vol. 54 ›› Issue (10): 99-103.doi: 10.11799/ce202210019

• 研究探讨 • 上一篇    下一篇

临近采空区切眼留巷围岩稳定控制技术

马资敏,王彦军,王海杰,苏毅,马磊   

  1. 1. 山东理工大学
    2. 山西银锋科技有限公司
    3. 山西黄土坡鑫运煤业有限公司
    4. 中国矿业大学(北京)
  • 收稿日期:2022-06-21 修回日期:2022-07-26 出版日期:2022-10-14 发布日期:2023-01-06
  • 通讯作者: 马资敏 E-mail:maziminhao@163.com

Surrounding rock stability control technology of open - cutting entry retaining near goaf

  • Received:2022-06-21 Revised:2022-07-26 Online:2022-10-14 Published:2023-01-06

摘要: 针对临近采空区切眼实施留巷围岩控制难题,通过理论分析及现场试验,对切眼留巷支护系统及卸压关键技术开展研究。提出了顶板卸压、围岩主动支护、高强度被动加固的综合围岩控制技术方案与工艺流程。针对厚层坚硬顶板实施“定向预裂+松动爆破”组合卸压技术,通过参数优化设计,实现了90%的单裂缝面及架后采空区顶板及时冒落,改善了围岩结构|采后及时采用“帮部加强锚索+顶板恒阻锚索+挡矸密闭+交替木垛+单体棚”支护,通过主被动支护加固措施控制围岩变形。工作面推进280m时切眼留巷围岩稳定,两帮移近量小于300mm,以底鼓为主的顶底板移近量小于500mm,切眼留巷围岩控制效果满足生产需求。

关键词: 临近采空区, 开切眼, 沿空留巷, 坚硬顶板, 围岩控制

Abstract: In order to solve the problem of surrounding rock control of open - cutting entry retaining near goaf, this paper studies the supporting system and key technologies of pressure relief through theoretical analysis and field test. The comprehensive surrounding rock control technology system and process of roof pressure relief, surrounding rock active support and high strength passive reinforcement are proposed. The ' directional pre-splitting + loose blasting ' combined pressure relief technology is implemented for thick hard roof. Through parameter optimization design, 90 % of the single fracture surface and the roof of the goaf behind the hydraulic supports is timely caving, and the surrounding rock structure is improved. After mining, the support of ' the coal side reinforcement anchor cable + roof constant resistance anchor cable + gangue sealing support+ alternating wooden stack + hydraulic single shed ' is adopted in time, and the deformation of surrounding rock is controlled by active and passive support reinforcement measures. When the working face is mined at 280 m, the surrounding rock of the open - cutting retaining roadway is stable, the displacement of the two sides is less than 300 mm, and the displacement of the roof and floor based on the floor heave is less than 500 mm. The surrounding rock control effect of the open - cutting retaining roadway meets the production demand.

中图分类号: