[1]张荣立, 何国纬, 李 铎 等.采矿工程设计手册[M].北京:煤炭工业出版社, 2003.
[2]中国煤炭科工集团南京设计研究院有限公司, 中国煤炭建设协会勘察设计委员会.煤炭工业矿井设计规范:GB 50215-2015 [S].北京:中国计划出版社, 2016.
[3]崔汉涛, 边 凯.煤矿井下排水泵站及排水管路设计规范》编制问题探讨[J].煤炭工程, 2020, 52(11):33-35
[4]CUI Hantao, BIAN Kai.Introduction of the compilation of code for design of pumping station and Pipeline of underground Coal Mine[J].Coal Engineering, 2020, 52(11):33-35
[5]王中亮, 刘海泉, 王振哄.李楼煤矿矿井抗灾排水系统设计优化[J].煤炭工程, 2022, 54(4):7-11
[6]WANG Zhongliang, LIU Haiquan, WANG Zhenhong.Optimization of mine disaster-resistant drainage system design of Lilou Coal Mine[J].Coal Engineering, 2022, 54(4):7-11
[7]李善红, 王 辉, 宋国忠.龙固煤矿井底车场辅助排水系统设计[J].煤炭工程, 2012, 8(8):25-26
[8]LI Shanhong, WANG Hui, SONG Guozhong.Design on Auxiliary Water Drainage System of Mine Shaft Bottom in Longgu Mine[J].Coal Engineering, 2012, 8(8):25-26
[9]温星星.基于的井下水泵房三维建模技术研究及应用[J].煤炭工程, 2021, 53(8):35-38
[10]WEN Xingxing.D modeling of underground water pump house based on BIM[J].Coal Engineering, 2021, 53(8):35-38
[11]于功江.大涌水量千米深井主排水系统设计问题探讨[J].煤炭工程, 2019, 51(6):43-46
[12]YU Gogjiang.Discussion on Main Drainage System Design of 1000m-deeperShaft with Large Water Inflow[J].Coal Engineering, 2019, 51(6):43-46
[13]李树峰.煤矿井下盘区临时排水系统设计探讨[J].煤炭工程, 2021, 53(7):11-13
[14]LI Shufeng.Discussion on design of temporary drainage system in underground coal mine[J].Coal Engineering, 2021, 53(7):11-13
[15]董小军.水文地质资料对煤矿防治水工作的重要性分析[J].煤炭工程, 2019, 51(9):90-92
[16]DONG Xiaojun.Analysis on the Importance of Hydrogeology in Coal Mine Water Prevention and Control[J].Coal Engineering, 2019, 51(9):90-92
[17]杨浩辉.煤矿井下抗灾排水系统布置方式影响因素探讨[J].煤炭工程, 2019, 50(6):20-22
[18]YANG Haohui.Discussion on influencing factors for arrangement form of disaster-resistant drainage system in underground coal mine[J].Coal Engineering, 2019, 50(6):20-22
[19]魏红磊.吉宁矿采区水泵房与水仓优化设计[J].煤炭工程, 2016, 48(5):11-13
[20]WEl Honglei.Optimization Design of the pump house and water sump in Jining mine[J].Coal Engineering, 2016, 48(5):11-13
[21]吴晓东, 李 翔.顾桥煤矿东区二水平主排水泵房优化设计[J].煤炭工程, 2023, 55(3):8-11
[22]WU Xiaodong, LI Xiang.Optimal design of the second level main pump house in the east area of Guqiao Coal Mine[J].Coal Engineering, 2023, 55(3):8-11
[23]郑复伟.盘区水泵房配水巷优化设计[J].煤炭工程, 2009, 4(4):9-10
[24]ZHENG Fuwei.Optimal design of the water distribution roadway in the pump room of the panel area[J].Coal Engineering, 2009, 4(4):9-10
[25]刘文清.浅析泵房吸水井设计新方案[J].煤炭工程, 2009, 6(3):13-14
[26]LIU Wenqing.A Brief Analysis of the New Design Scheme for Suction Wells in Pump Room[J].Coal Engineering, 2009, 6(4):13-14
[27]郑洪品.井下主排水系统及中央变电所设计若干问题探讨[J].煤炭工程, 2001, 1(12):42-44
[28]ZHENG Hongpin.Discussion on Several Issues Concerning the Design of Underground Main Drainage System and Central Substation[J].Coal Engineering, 2001, 1(12):42-44
[29]纪海亮.吸入式主排水泵房配水系统设计探讨[J].矿业安全与环保, 2000, 27(2):41-42
[30]JI Hailiang.Discussion on the Design of Water Distribution System for Suction Main Drainage Pump Room[J].Mining Safety & Environmental Protection, 2000, 27(2):41-42
[31]林 青, 乔 伟.崔木煤矿顶板离层水防治技术[J].煤炭科学技术, 2016, 44(3):129-134
[32]Lin Qing, Qiao Wei.Water prevention and control technology of roof bed separation in Cuimu Mine[J].Coal Science and Technology, 2016, 44(3):129-134
[33]张世清.朱家河矿主排水泵房施工[J].建井技术, 2000, 21(5):14-16
[34]ZHANG Shiqing.Construction of the main drainage pump house at Zhujiahe Mine[J].Mine Construction Technology, 2000, 21(5):14-16
[35]范广建.千米深井中央水泵房围岩控制技术[J].煤炭工程, 2012, 7(5):34-48
[36]FAN Jianguang.Surrounding rock control technology for the central pump house of a 1000-meter deep well 7[J].Coal Engineering, 2012, 7(7):34-38
[37]胡国保.高效无声静力破碎剂应用于煤矿井下排水泵房掘进[J].建井技术, 2018, 39(4):22-24
[38]HU Guobao.High Efficient Soundless Statie Cracking Agent Applied to Excavation of Water Drainage Pumping Chamber in Underground Mine[J].Mine Construction Technology, 2018, 39(4):22-24
[39]黎明镜, 程 桦, 荣传新.施工扰动下深井硐室衬砌结构受力及稳定性分析[J].煤炭科学技术, 2013, 41(11):34-38
[40]LI Mingjing, CHENG Hua, RONG Chuanxin.Mechanics and Stabilization Analysis on Lining Structure of Chamber Under Disturbed Effects by Excavation in Deep Coal Mine[J].Coal Science and Technology, 2013, 41(11):34-38
|