[1] |
王志强,苏越,宋梓瑜,石磊,孙中文.超长推进距离工作面双巷布置沿空掘巷技术及应用效果分析[J].岩石力学与工程学报, 2018, 37(S2):4170-4176
|
[2] |
Wang Zhiqiang, Su Yue, Song Ziyu, Shi Lei, Sun Zhonghua.Analysis of technology and application effect of double-lane roadway driving along the goaf with super-long propulsion distance[J].Journal of Rock Mechanics and Engineering, 2018, 37(S2):4170-4176
|
[3] |
刘洪涛,吴祥业,镐振,赵希栋,郭晓菲.双巷布置工作面留巷塑性区演化规律及稳定控制[J].采矿与安全工程学报, 2017, 34(04):689-697
|
[4] |
Liu Hongtao, Wu Xiangye, Hao Zhen, Zhao Xidong, Guo Xiaofei.Evolution Law and Stability Control of the Plastic Zone in the Alley of Double-lane Layout Working Face[J].Journal of Mining and Safety Engineering, 2017, 34(04):689-697
|
[5] |
陈苏社,朱卫兵.活鸡兔井极近距离煤层煤柱下双巷布置研究[J].采矿与安全工程学报, 2016, 33(03):467-474
|
[6] |
Chen Sushe, Zhu Weibing.Study on the layout of double roadways under coal pillars in extremely close distance coal seam of Huojitujing[J].Journal of Mining and Safety Engineering, 2016, 33(03):467-474
|
[7] |
余学义,王琦,赵兵朝,薄其山,王洪涛.大采高双巷布置工作面巷间煤柱合理宽度研究[J].岩石力学与工程学报, 2015, 34(S1):3328-3336
|
[8] |
Yu Xueyi, Wang Qi, Zhao Bingchao, et al.Study on reasonablewidth of pillar between roadways in large mining height face withdouble roadways layout[J]. Chinese Journal of Rock Mechanicsand Engineering[J].Chinese Journal of Rock Mechanicsand Engineering, 2015, :3328-3336
|
[9] |
董亚东,姚伟,刘耀辉.大采深高地应力双巷布置工作面强矿压治理[J].煤炭科学技术, 2018, 46(S2):103-107
|
[10] |
Dong Yadong, Yao Wei, Liu Yaohui.High mining pressure and high ground stress double roadway layout working face strong mine pressure control[J].Coal Science and Technology, 2018, 46(S2):103-107
|
[11] |
杨科,谢广祥.窄煤柱综放巷道围岩应力特征[J].采矿与安全工程学报, 2007, 24(3):311-315
|
[12] |
YANG Ke, XIE Guangxiang.Stress field of surroundingrocks of fully mechanized top-coal caving gateway withsmall pillars[J].Journal of Mining & Safety Engineering, 2007, 24(3):311-315
|
[13] |
李磊,柏建彪,王襄禹.综放沿空掘巷合理位置及控制技术[J].煤炭学报, 2012, 37(09):1564-1569
|
[14] |
LI Lei, BAI Jianbiao, WANGXiangyu.Rational position and control technique of roadway drivingalone next goaf in fully mechanized top coal caving face[J].Journal of China Coal Society, 2012, 37(9):1546-1569
|
[15] |
张广超,何富连,来永辉,宋佳伟,肖鹏.高强度开采综放工作面区段煤柱合理宽度与控制技术[J].煤炭学报, 2016, 41(09):2188-2194
|
[16] |
Zhang Guangchao, He Fulian, Lai Yonghui, Song Jiawei, Xiao Peng.Reasonable width and control technology of coal pillars in fully mechanized top coal caving face in high-strength mining[J].Journal of China Coal Society, 2016, 41(09):2188-2194
|
[17] |
Ding Ziwei, Jia Jindui, Bagherieh Amirhossein, Li Ji, Song Yue.Mechanism and Control of Spalling for Friable Sandstone Pillars in a Room and Pillar Mine[J].Journal of Engineering Science and Technology Review, 2018, 11(6):197-205
|
[18] |
黄庆享,杜君武,刘寅超.浅埋煤层群工作面合理区段煤柱留设研究[J].西安科技大学学报, 2016, 36(01):19-23
|
[19] |
Huang Qingxiang, Du Junwu, Liu Yinchao.Research on reasonable section coal pillar retention in working face of shallow buried coal seam group[J].Journal of Xi’an University of Science and Technology, 2016, 36(01):19-23
|
[20] |
赵宾,王方田,梁宁宁,王文林.高应力综放面区段煤柱合理宽度与控制技术[J].采矿与安全工程学报, 2018, 35(01):19-26
|
[21] |
Zhao Bin, Wang Fangtian, Liang Ningning, Wang Wenlin.Reasonable width and control technology of coal pillars in high stress fully mechanized caving face[J].Journal of Mining and Safety Engineering, 2018, 35(01):19-26
|
[22] |
李洪,耿献文,朱学军.区段煤柱宽度的实测确定[J].矿山压力与顶板管理, 2005, (01):31-32
|
[23] |
Li Hong, Geng Xianwen, Zhu Xuejun.Measurement and determination of coal pillar width in sections[J].Mine Pressure and Roof Management, 2005, (01):31-32
|
[24] |
吴旋,来兴平,郭俊兵,崔峰,王泽阳,许慧聪.综采面区段煤柱宽度的-预测模型[J].西安科技大学学报, 2020, 40(01):64-70
|
[25] |
Wu Xuan, Lai Xingping, Guo Junbing, Cui Feng, Wang Zeyang, Xu Huicong.PSO-SVM prediction model of coal pillar width in fully mechanized mining face[J].Journal of Xi’an University of Science and Technology, 2020, 40(01):64-70
|
[26] |
张广超,何富连.大断面综放沿空巷道煤柱合理宽度与围岩控制[J].岩土力学, 2016, 37(06):1721-1728
|
[27] |
Zhang Guangchao, He Fulian.Reasonable width of coal pillars and surrounding rock control along roadways in large section fully mechanized top coal caving[J].Rock and Soil Mechanics, 2016, 37(06):1721-1728
|
[28] |
孔德中,王兆会,李小萌,王颜亮,王闯.大采高综放面区段煤柱合理留设研究[J].岩土力学, 2014, 35(S2):460-466
|
[29] |
Kong Dezhong, Wang Zhaohui, Li Xiaomeng, Wang Yanliang, Wang Chuang.Study on rational retention of coal pillars in fully mechanized caving face with large mining height[J].Rock and Soil Mechanics, 2014, 35(S2):460-466
|
[30] |
王琦,樊运平,李刚,郭文孝,闫殿华,张立平.厚煤层综放双巷工作面巷间煤柱尺寸研究[J].岩土力学, 2017, 38(10):3009-3016
|
[31] |
Wang Qi, Fan Yunping, Li Gang, Guo Wenxiao, Yan Dianhua, Zhang Liping.Research on the size of coal pillars in double-cavity working face of fully mechanized top coal caving in thick coal seam[J].Rock and Soil Mechanics, 2017, 38(10):3009-3016
|