摘要:

井工煤矿开采过程中有时面临原有巷道断面尺寸不能满足正常生产而需要扩帮的情况,针对扩帮增跨存在巷道围岩稳定性降低、扩帮施工工艺及支护设计等问题,以汇兴煤矿5-2煤层北翼盘区带式输送机巷赋存情况和现有支护条件为背景,采用理论分析和数值模拟相结合的方法,研究了扩帮段围岩安全稳定性和顶板极限跨距,论证了北翼盘区带式输送机巷扩帮增跨可行性;对比分析了扩帮前后围岩应力演化规律、塑性区发育特征和护巷煤柱安全稳定性,并结合巷道支护极限自稳平衡拱理论得出北翼盘区带式输送机巷扩帮前后两帮破坏深度基本不变,扩帮后顶板破坏高度和极限平衡拱高度分别增加了13.1%和10.9%。基于此,确定了扩帮段支护参数,提出了“扩帮前顶板补打锚索、扩帮时及时支护新掘顶板及扩帮侧帮部”的施工工艺。最后,进行了扩帮施工及支护现场应用研究。结果表明,扩帮段围岩内部未见明显裂隙,围岩表面未出现明显片帮和移动变形,巷道整体安全稳定。

关键词: 煤层巷道, 扩帮增跨, 数值模拟, 围岩稳定性, 支护设计, 施工工艺

Abstract:

In the process of underground coal mining, sometimes the original roadway section size cannot meet the normal production and needs to be expanded. Aiming at the problems of reducing the stability of roadway surrounding rock, expanding construction technology and supporting design, taking the occurrenc
摘要(英文)
e of belt conveyor roadway and the existing supporting conditions in the north wing panel of 5-2 coal seam in Huixing Coal Mine as the background, the safety and stability of surrounding rock and the limit span of roof are studied by combining theoretical analysis with numerical simulation, and the feasibility of expanding the side and increasing the span of belt conveyor roadway in the north wing panel is demonstrated. The stress evolution law of surrounding rock, the development characteristics of plastic zone and the safety and stability of roadway coal pillar before and after expansion are compared and analyzed. Combined with the limit self-stable equilibrium arch theory of roadway support, it is concluded that the failure depth of the two sides before and after the expansion of the belt conveyor roadway in the north wing panel is basically unchanged, and the roof failure height and the limit equilibrium arch height after the expansion are increased by 13.1% and 10.9% respectively. On this basis, the support parameters of the expansion section are determined, and the expansion construction technology of 'reinforcing the anchor cable in the roof before the expansion, supporting the new excavation roof and the expansion side in time during the expansion ' is proposed. Finally, the expansion construction and support field application research were carried out. The results show that there is no obvious crack in the surrounding rock of the expansion section, and there is no obvious spalling and moving deformation on the surface of the surrounding rock, and the overall safety and stability of the roadway.

中图分类号: