摘要: 针对深部煤层瓦斯预抽而施工的地面瓦斯直井,在钻进过程中,需钻穿上部煤层的采空区,而穿采空区井段由于钻井液漏失易造成岩屑上返困难从而导致卡钻等复杂事故。为了快速、安全钻穿采空区,根据“上三带”中的垮落带、断裂带以及“下三带”中的底板导水破坏带高度计算公式,得到易发生钻井液漏失井段的深度,提出了优化后的四开井身结构和对应井段所采用的循环介质。在此基础上,结合沁水盆地寺河矿区地质条件,进行井身结构设计和循环介质性能设计,成功实施一口穿采空区瓦斯抽采直井。结果表明:一开、二开及四开井段采用水基钻井液体系以较小漏失量钻进,三开井段采用氮气循环介质钻进,能够实现一次性高效顺利穿越采空区,达到快速、安全完井的目的。

关键词: 穿越采空区, 岩层扰动带, 井身结构, 钻进方式, 瓦斯

Abstract: For the construction of surface gas vertical wells for gas pre-extraction in deep coal seams, during the drilling process, it is necessary to drill through the goaf of the upper coal seam. However, it is difficult to return rock cuttings due to drilling fluid leakage for the section passing through the goaf. In order to drill through the goaf quickly and safely, it is based on the calculation formulas for the height of the collapse zone, fracture zone, and bottom plate water conduction failure zone in the "upper three zones", the depth of the well section prone to drilling fluid leakage is obtained. The optimized structure of the fourth spud well and the corresponding circulating medium used in the well section are proposed. On this basis, combined with the geological conditions of the SiHe mining area in the Qinshui Basin, the well structure design and circulating medium performance design were carried out, and a vertical well for gas extraction through the goaf was successfully implemented. The results show that for the first, second, and fourth spud sections drilling by using water-based drilling fluid systems with minimal leakage, while the third spud section is drilled by using nitrogen circulation medium, which have achieved efficient and smooth passage through the goaf at once, achieving the goal of rapid and safe completion.

Key words: through goaf, rock disturbance zone, well structure, drilling method, gas