COAL ENGINEERING ›› 2014, Vol. 46 ›› Issue (7): 34-36.doi: 10.11799/ce201407012
Previous Articles Next Articles
Received:
Revised:
Online:
Published:
Abstract:
For Changping mine,under high horizontal stress large cross section along the bottom roadway is difficult to support the status quo, through stress testing, drilling peep, numerical simulation methods such as roadway roof rock failure analysis. According to the analysis of the conclusions, put forward 43042 roadway along the top layout support programs, and by setting the station measured surface displacement, roof separation, rock-bolt dynamometer and other methods,its stability were analyzed to verify the 43042 roadway programs reasonable.
Key words: Roadway supporting, geostress, High horizontal stress, Drilling peep, Numerical Simulation
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.coale.com.cn/EN/10.11799/ce201407012
http://www.coale.com.cn/EN/Y2014/V46/I7/34
[1]杨运峰. 高应力破碎带大断面巷道支护技术[J] .煤炭工程,2006,(5):18-20. [2]张文彬.长平煤矿地应力分布规律研究及其应用[J].煤矿开采,2010,(6):96-98. [3]彭文斌.FLAC3D实用教程[M].北京:机械工业出版社,2008. [4]汤建泉.现场矿压观测方案设计[J].煤矿开采,2008,(2):71-74. [5]陆庭侃,戴耀辉.全长锚固锚杆在回采巷道层状顶板的工作特性[C]//第十一次全国岩石力学与工程学术大会论文集.北京:科学出版社,2010:747-753.