[1] S Q Niu,S S Yang,L Cui. Research on the Characteristics of Strain-softening Model after Peak Based on Morh-Cloumb Theory Criterion[J]. Adv. Mater. Res.,2011,261-263: 439-1443. [2] S S Yang,S Q Niu. Thick Board Theory on the Bolting Support of the Ribs in Coal Mine Roadway[J]. Adv. Mater. Res.,2011,255-260: 3775-3779. [3] 杨双锁. 煤矿回采巷道围岩控制理论探讨[J]. 煤炭学报,2010,35(11) : 1842-1853. [4] 贾喜荣. 岩石力学与岩层控制[M].江苏:中国矿业大学出版社,2010. [5] 牛少卿,杨双锁,王志刚,寇永嘉. 非均匀水平应力场中井壁结构的优化设计研究[J]. 山西大同大学学报(自然科学版),2010,26(3): 60-63. [6] 杨双锁. 回采巷道围岩控制理论及锚固结构支护原理[M].北京:煤炭工业出版社,2004. [7] B. Liu,Z.Q. Yue,L.G. Tham. Analytical design method for a truss-bolt system for reinforcement of fractured coal mine roofs—illustrated with a case study. International Journal of Rock Mechanics & Mining Sciences 2005; 42: 195–218. [8] 牛少卿. 长壁开采三顺槽围岩控制理论技术研究[D]. 太原:太原理工大学,2011. [9] 杨双锁,曹建平. 锚杆受力演变机理及其与合理锚固长度的相关性[J]. 采矿与安全工程学报,2010,27(1) : 1-7.