煤炭工程 ›› 2022, Vol. 54 ›› Issue (2): 55-61.doi: 10.11799/ce202202010

• 施工技术 • 上一篇    下一篇

三软煤层巷道布置优化与联合支护技术研究

王国龙1,常云博2,林陆3,杜湃3,李航3   

  1. 1. 中煤集团山西华昱能源有限公司
    2. 北京天地华泰采矿工程技术有限公司
    3. 中国矿业大学(北京)
  • 收稿日期:2021-09-24 修回日期:2021-12-25 出版日期:2022-02-14 发布日期:2022-07-06
  • 通讯作者: 王国龙 E-mail:413110544@qq.com

Study on roadway layout optimization and joint support technology of three soft coal seams

  • Received:2021-09-24 Revised:2021-12-25 Online:2022-02-14 Published:2022-07-06

摘要: 为解决三软煤层回采巷道围岩大变形难支护和区段间留设大煤柱资源浪费的问题,对巷道布置和支护方式进行了优化,采用了厚煤层错层位外错式沿空掘巷相邻巷道联合支护的方法。首先采用极限平衡区法确定沿空巷道煤柱留设5m,建立了关键块B力学模型,计算分析了关键块B不会发生滑落失稳与回转失稳|其次介绍了相邻巷道联合支护技术|最后采用FLAC3D数值模拟软件模拟比较了采用错层位沿空掘巷原支护方案和巷道支护方案优化后回采期间巷道围岩支护效果。结果表明:优化后支护方案顶板浅部围岩可稳定悬吊在深部稳定岩层中,控制巷道浅部围岩变形|侧帮锚索与巷道顶部锚索形成联合锚固区,增强了顶板抗离层能力,加强了顶板围岩不同方向节理裂隙的控制能力,可有效保证巷道围岩处于稳定状态。

关键词: 三软煤层, 巷道布置, 错层位, 沿空掘巷, 联合支护

Abstract: In order to solve the problems of large deformation and difficult support of surrounding rock of roadway in three soft coal seams and waste of resources of retaining large coal pillars between sections, the roadway layout and support mode are optimized. The method of combined support of adjacent roadway of roadway excavation along goaf in staggered position and staggered outside of thick coal seam is adopted. Firstly, the coal pillar of roadway along goaf is determined to be 5 m by limit equilibrium zone method, and the mechanical model of key block B is established, It is calculated and analyzed that the key block B will not have sliding instability and rotary instability. Secondly, the combined support technology of adjacent roadways is introduced. Finally, FLAC3D numerical simulation software is used to simulate and compare the surrounding rock support effect during roadway recovery after the original support scheme of roadway excavation along the goaf with staggered layer is optimized and the roadway support scheme is optimized, The results show that the optimized support scheme can stably suspend the shallow surrounding rock of the roof in the deep stable rock stratum and control the deformation of the shallow surrounding rock of the roadway; The side wall anchor cable and the roadway top anchor cable form a joint anchor zone, which enhances the anti separation ability of the roof, strengthens the control ability of joint fissures in different directions of the roof surrounding rock, and can effectively ensure that the roadway surrounding rock is in a stable state.

中图分类号: