煤炭工程 ›› 2022, Vol. 54 ›› Issue (7): 67-73.doi: 10.11799/ce202207013

• 生产技术 • 上一篇    下一篇

切顶留巷综采面采空区防漏风技术研究

于大河,王怡,孙祥科,李洪先,徐书荣,任广意   

  1. 山东科技大学
  • 收稿日期:2022-03-04 修回日期:2022-04-05 出版日期:2022-07-15 发布日期:2022-07-20
  • 通讯作者: 王怡 E-mail:1064951769@qq.com

Study on Countermeasures of air leakage prevention technology in goaf of fully mechanized face with entry retaining by roof cutting

  • Received:2022-03-04 Revised:2022-04-05 Online:2022-07-15 Published:2022-07-20

摘要: 为掌握切顶留巷条件下的采空区漏风规律,降低对采空区的漏风供氧,首先利用COMSOL数值模拟软件分析了青龙煤矿21606综采工作面切顶留巷采空区的漏风流场,模拟结果表明:切顶留巷“Y”型通风方式下,采空区漏风风速沿远离综采面的方向明显衰减,采空区漏风路径主要为:从下隅角进入,经采空区流向上隅角和通风立眼处。其次,利用SF6现场示踪试验对模拟结果进行验证,结合模拟和现场试验结果得到了采空区漏风流场的特征,并分区域制定了针对性的防漏风措施:在切顶留巷及通风立眼处采取砌墙并进行喷浆处理|在工作面进行切顶爆破加速顶板垮落|在补回风巷和回风巷上隅角处砌筑沙袋墙并喷涂施密特防漏风材料|在切眼及补切眼处进行喷浆和及时封堵切眼瓦斯抽采钻孔|补充压注凝胶等综合措施。通过综合防漏风措施的实施,降低了工作面自然发火风险,保证了工作面的安全回采。

关键词: 切顶留巷, 采空区, Y型通风, 数值模拟, 漏风封堵

Abstract: The 21606 working face of Qinglong Coal Mine adopts the entry retaining by roof cutting technology, and the ventilation mode is the "Y" ventilation mode of "one inlet and two return". Facing the problems of wide air leakage range and large air leakage in the goaf, it is very easy to cause the residual coal in this face and adjacent goaf to ignite naturally.In this regard, taking 21606 working face as the research object, firstly, the distribution of air leakage field in goaf with entry retaining by roof cutting is studied through COMSOL numerical simulation. The numerical simulation results show that:Under the "Y" ventilation mode of entry retaining by roof cutting, the air leakage wind speed in the goaf decreases significantly along the direction away from the fully mechanized mining face. The air leakage path in the goaf mainly enters from the lower corner and flows through the goaf to the upper corner and the ventilation eye.The air leakage prevention measures taken for different areas mainly include: building walls and shotcreting at the cut-off roadway and ventilation vertical hole; The roof cutting blasting is carried out in the working face to accelerate the roof collapse; Sand bag wall shall be built at the upper corner of the make-up track and the track, and Schmidt air leakage proof material shall be sprayed; Shotcreting shall be carried out at the cut hole and make-up cut hole, and the gas drainage hole of the cut hole shall be blocked in time; And spray inhibitor, pressure gel injection and other measures.Through the above comprehensive air leakage prevention measures, the safe mining of the working face is ensured.