煤炭工程 ›› 2015, Vol. 47 ›› Issue (9): 28-30.doi:
• 设计技术 • 上一篇 下一篇
郭文孝
收稿日期:
修回日期:
出版日期:
发布日期:
通讯作者:
Received:
Revised:
Online:
Published:
摘要: 综掘面临时支护支架组是配套综掘机进行掘进的短壁工作面机械化支护设备,在掘进时对顶板进行临时支护。介绍了综掘面临时支护支架组的主要技术参数、液压控制系统的特点和组成以及功能和操作原理,经实践证明该系统设计合理、稳定可靠、提高了工作效率,保证了人员与设备的安全。
关键词: 综掘面临时支护, 支架组, 液压控制系统, 超前支护, 单体支柱
Abstract: Temporary support stent group of mechanized excavation face is supporting mechanized short wall mechanized machine excavation support equipment, temporary support of roof while digging. Introduced the comprehensive mechanized coal mining face timbering support set technical parameters, characteristic of hydraulic control systems and components, as well as features and operating principles, proved to the reasonable design, stable and reliable, improves the efficiency of the system to ensure the safety of personnel and equipment.
Key words: Temporary support stent group of mechanized excavation face, hydraulic control system, function, operating principles
郭文孝. 综掘面临时支护支架组液压控制系统的设计[J]. 煤炭工程, 2015, 47(9): 28-30.