[1]许延春, 陈胜然, 柳杰, 等.焦作矿区底板注浆加固工作面富水性分区及加固效果分析[J].煤矿开采, 2013, 18(03):110-113[2]XU Yanchun, CHEN Shengran, LIU Jie, et.Analysis of watery partition and reinforcement effect for reinforcing mining face with floor grunting in Jiaozuo coal area[J].Coal Mining Technology, 2013, 18(03):110-113[3]许延春, 古文哲, 曹旭初, 等.赵固一矿底板灰岩含水层采动影响研究[J].煤炭工程, 2016, 48(06):91-94[4]XU Yanchun, GU Wenzhe, CAO Xuchu, et.Study of influence on floor limestone aquifers in Zhaogu No1 mine[J].Coal Engineering, 2016, 48(06):91-94[5]靳德武.我国煤矿水害防治技术新进展及其方法论思考[J].煤炭科学技术, 2017, 45(05):141-147[6]Jin Dewu.New development of water disaster prevention and control technology in China coal mine and consideration on methodology[J].Coal Science and Technology, 2017, 45(05):141-147[7]张鹏, 孙亚军, 曹焕举.煤层底板承压含水层上安全开采技术研究[J].煤炭科学技术, 2012, 40(09):104-107[8]ZHANG Peng, SUN Yajun, CAO Huanju.Study on technology of safety mining above pressurized aquifer in Seam floor[J].Coal Science and Technology, 2012, 40(09):104-107[9] 刘白宙.焦作矿区防止突水淹井事故的对策[J].煤田地质与勘探, 2007, (03):49-51[10]LIU Baizhou.Countermeasure against preventing accidents of water inrush in Jiaozuo coal mine area[J]. 2007(03): 49-51.[J].Coal Geology & Exploration, 2007, (03):49-51[11]许延春, 杨扬.回采工作面底板注浆加固防治水技术新进展[J].煤炭科学技术, 2014, 42(01):98-101[12]XU Yanchun, YANG Yang.New progress on floor grouting reinforcement technology of water control in coal mining face[J].Coal Science and Technology, 2014, 42(01):98-101[13]李振华, 许延春, 陈新明.高水压工作面底板注浆加固技术研究[J].煤炭工程, 2013, 45(05):32-35[14]LI Zhenhua, XU Yanchun, CHEN Xinming.Study on grouting reinforcement technology of high water pressure floor in coal mining face[J].Coal Engineering, 2013, 45(05):32-35[15]郭盛彬, 杨高峰, 李俊杰, 等.马兰煤矿主斜井底水仓底板加固防治水方法[J].煤田地质与勘探, 2017, 45(01):90-94[16]GUO Shengbin, YANG Gaofeng, LI Junjie, et.The main slope bottom water warehouse floor reinforcement methods research of Malan coal mine[J].Coal Geology & Exploration, 2017, 45(01):90-94[17]金鑫, 段会军, 崔岩波, 等.桑树坪矿煤层底板注浆加固定向钻孔钻进技术[J].煤炭工程, 2018, 50(01):45-47[18]JIN Xin, DAUN Huijun, CUI Yanbo, et.Drilling technology of directional drilled borehole for grouting reinforcement of coal seam floor in Sangshuping Coal Mine[J].Coal Engineering, 2018, 50(01):45-47[19]施龙青, 邱梅, 牛超, 等.肥城煤田奥灰顶部注浆加固可行性分析[J].采矿与安全工程学报, 2015, 32(03):356-362[20]SHI Longqing, QIU Mei, NIU Chao, et.Feasibility analysis of grouting reinforcement of Ordovician top in Feicheng coalfield[J].Journal of Mining & Safety Engineering, 2015, 32(03):356-362[21]赵兵文, 关永强.大采深矿井高承压奥灰岩溶水综合治理技术[J].煤炭科学技术, 2013, 41(09):75-78[22]ZHAO Bingwen, GUAN Yongqiang.Comprehensive treatment technology of high pressure-bearing Ordovician limestone karst water in large mining depth mine[J].Coal Science and Technology, 2013, 41(09):75-78[23]赵庆彪.奥灰岩溶水害区域超前治理技术研究及应用[J].煤炭学报, 2014, 39(06):1112-1117[24]ZHAO Qingbiao.Ordovician limestone karst water disaster regional advanced governance technology study and application[J].Journal of China Coal Society, 2014, 39(06):1112-1117[25]许延春, 李江华, 刘白宙.焦作矿区煤层底板注浆加固工作面突水原因与防治[J].煤田地质与勘探, 2014, 42(04):50-54[26]XU Yanchun, LI Jianghua, LIU Baizhou.Reinforcement of working face by grouting in floor in Jiaozuo coal mining area[J].Coal Geology & Exploration, 2014, 42(04):50-54[27]. 许延春,戴华阳.沉陷控制与特殊开采[M].徐州:中国矿业大学出版社,2017.[28]许延春, 李见波.注浆加固工作面底板突水“孔隙-裂隙升降型”力学模型[J].中国矿业大学学报, 2014, 43(01):49-55[29]XU Yanchun, LI Jianbo.Pore-fractured lifting type” mechanical model for floor water inrush of grouting enforcement working face[J].Journal of China University of Mining & Technology, 2014, 43(01):49-55 |