煤炭工程 ›› 2023, Vol. 55 ›› Issue (1): 53-58.doi: 10.11799/ce202301011

• 生产技术 • 上一篇    下一篇

坚硬顶板工作面初采深浅孔耦合三维定向水力致裂技术研究#br#
#br#

张京民,孟波,刘洪晨   

  1. 1. 库车市科兴煤炭实业有限责任公司
    2. 中国矿业大学
  • 收稿日期:2022-08-23 修回日期:2022-10-20 出版日期:2023-01-20 发布日期:2023-04-11
  • 通讯作者: 张京民 E-mail:zjmysq1980@163.com

Study on coupling 3D directional hydraulic fracturing technology of depth and shallow holes in initial mining in hard roof working face

  • Received:2022-08-23 Revised:2022-10-20 Online:2023-01-20 Published:2023-04-11
  • Contact: 张 ZHANGjing-min E-mail:zjmysq1980@163.com

摘要: 针对坚硬顶板下工作面初采阶段顶板难以自行垮落造成的采空区悬顶面积大、漏风严重以及悬顶突然大面积垮落带来的冲击力对设备和人员造成危害等问题,提出了初采深浅孔耦合三维定向水力致裂弱化顶板技术方案,通过理论分析、数值计算和现场观测等方法,对比工作面切眼未水力致裂及新工艺水力致裂初次来压数据,研究了初采深浅孔耦合三维定向水力致裂技术对厚煤层综放面坚硬顶板结构控制机理。结果表明,深浅孔耦合三维定向水力致裂使1012工作面基本顶初次来压步距从58m缩短为16.3m,大大改善了坚硬顶板工作面初采期间的安全生产条件。

关键词: 坚硬顶板, 深浅孔, 水力致裂, 初采期

Abstract: Aiming at the problems of large overhanging roof area and serious air leakage in the goaf caused by the difficulty of the roof to collapse on its own in the initial mining stage of the working face under the hard roof, and the impact force caused by the sudden large-area collapse of the overhanging roof causes harm to equipment and personnel, etc, put forward a technical scheme of coupling three-dimensional directional hydraulic fracturing to weaken the roof at the initial mining depth and shallow hole. Through theoretical analysis, numerical calculation and field observation, etc., the first pressure data of the working face without hydraulic fracturing and the hydraulic fracturing of the new process were compared, the study revealed the control mechanism of the initial mining depth and shallow hole coupling 3D directional hydraulic fracturing technology on the hard roof structure of the fully mechanized caving face of the thick coal seam. The results show that the coupling of deep and shallow holes with three-dimensional directional hydraulic fracturing shortens the first pressure step of the basic roof of the 1012 working face from 58m to 16.3m, which greatly improves the safe production conditions during the initial mining of the hard roof.

中图分类号: