煤炭工程 ›› 2015, Vol. 47 ›› Issue (6): 58-60.doi: 10.11799/ce201506019
• 施工技术 • 上一篇 下一篇
王毅
收稿日期:
修回日期:
出版日期:
发布日期:
通讯作者:
Received:
Revised:
Online:
Published:
摘要: 针对李子垭南二井首采区3102综采工作面急倾斜大断面开切眼采取综掘机综掘导硐施工慢等问题,研究采用反井钻机法联合钻爆法进行开切眼贯通施工,并利用极限平衡法对大断面开切眼进行支护形式与参数设计,矿压监测结果表明,该施工技术与支护方案可行,不仅可实现快速、安全施工,使开切眼变形得到有效控制,而且具有显著的经济效益。
关键词: 急倾斜煤层, 大断面开切眼巷道掘进, 反井钻机法, 联合支护
Abstract: Abstract:liziya South Second mine first mining face inclination is 48°,soft roof and floor rock,coal has outburst,fast, how to cutting through fast a safe and economical open cut,control a good roof is a major problem.After many discussions,uses the anti-well drill through the construction,using limit equilibrium method for support designing.Mine pressure monitoring results show that the construction technology and support is feasible,the construction can be realized quickly and safely, and the open cut distortion has been effectively controlled.
Key words: Keywords: Anti-driller law, large section open - cut, steep seam, combined support, tunneling
中图分类号:
TD263.5
王毅,肖利平,李开学,等. 急倾斜煤层大断面开切眼快速施工技术研究[J]. 煤炭工程, 2015, 47(6): 58-60.
0 / / 推荐
导出引用管理器 EndNote|Reference Manager|ProCite|BibTeX|RefWorks
链接本文: http://www.coale.com.cn/CN/10.11799/ce201506019
http://www.coale.com.cn/CN/Y2015/V47/I6/58